IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,947

matching recommendations
Reset
ARC 3 WASTE MINIMIZATION / POLLUTION PREVENTION
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0084 # 08 Y:2012 08 2012 ELIMINATE/REDUCE AN OPERATION $6,939 $0 Implemented
UM0401 # 04 Y:2012 04 2012 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,066 $448 Implemented
SU0319 # 04 Y:2012 04 2012 ELIMINATE/REDUCE AN OPERATION $24,117 $15,840 Implemented
SD0445 # 05 Y:2012 05 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,844 $39,150 Implemented
AM0608 # 03 Y:2012 03 2012 RECOVER AND REUSE WASTE MATERIAL $144,150 $85,000 Implemented
BD0408 # 06 Y:2012 06 2012 RECOVER AND REUSE WASTE MATERIAL $975 $400 Implemented
OR0580 # 02 Y:2012 02 2012 ELIMINATE/REDUCE AN OPERATION $3,906 $14,500 Implemented
DL0080 # 05 Y:2012 05 2012 USE WATER-BASED ADHESIVES $7,845 $145 Implemented
BD0403 # 06 Y:2012 06 2012 MINIMIZE WATER USAGE $763 $1,000 Implemented
BD0403 # 07 Y:2012 07 2012 SELL OIL TO RECYCLER $515 $160 Implemented
NC0439 # 04 Y:2011 04 2011 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,390 $4,200 Implemented
GT0886 # 02 Y:2011 02 2011 METER WASTE WATER $5,529 $2,500 Implemented
OK0813 # 11 Y:2011 11 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,447 $25,472 Implemented
UD0839 # 13 Y:2011 13 2011 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $48,911 $75,000 Implemented
MI0209 # 04 Y:2011 04 2011 REPLACE TREATED WATER WITH WELL / SURFACE WATER $132,137 $500,000 Implemented
UD0832 # 08 Y:2011 08 2011 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,424 $500 Implemented
SU0306 # 03 Y:2011 03 2011 RECOVER AND REUSE SPENT ACID BATHS $49,465 $4,029 Implemented
SU0306 # 05 Y:2011 05 2011 RECOVER AND REUSE COOLING WATER $32,137 $12,052 Implemented
AM0592 # 03 Y:2011 03 2011 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $17,240 $0 Implemented
BD0386 # 14 Y:2011 14 2011 USE EVAPORATION TO CONCENTRATE MATERIAL $6,567 $10,000 Implemented
MZ0061 # 08 Y:2010 08 2010 REDUCE SCRAP PRODUCTION $92,766 $100,000 Implemented
MI0197 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,187 $180 Implemented
AM0580 # 07 Y:2010 07 2010 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,780 $1,520 Implemented
TT0055 # 03 Y:2010 03 2010 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $560 $825 Implemented
SU0296 # 06 Y:2010 06 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $79,942 $129,646 Implemented