IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,526

matching recommendations
Reset
ARC 3 WASTE MINIMIZATION / POLLUTION PREVENTION
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0266 # 09 Y:1988 09 1988 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $396 $580 Implemented
GT0346 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN WATER LINES AND VALVES $558 $20 Not Implemented
AT0117 # 01 Y:1988 01 1988 BURN WOOD BY-PRODUCTS FOR HEAT $22,310 $2,000 Implemented
OR0026 # 05 Y:1988 05 1988 RECOVER AND REUSE COOLING WATER $702 $2,050 Implemented
UD0266 # 07 Y:1988 07 1988 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,266 $30,000 Implemented
OR0028 # 02 Y:1988 02 1988 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $867 $87 Implemented
AM0033 # 10 Y:1988 10 1988 ELIMINATE LEAKS IN WATER LINES AND VALVES $393 $300 Implemented
UD0261 # 02 Y:1988 02 1988 RECOVER AND REUSE COOLING WATER $3,120 $6,000 Implemented
KU0248 # 02 Y:1988 02 1988 RECOVER AND REUSE COOLING WATER $19,728 $9,000 Implemented
CO0115 # 03 Y:1988 03 1988 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $23,377 $5,000 Implemented
LT0113 # 03 Y:1988 03 1988 BURN WOOD BY-PRODUCTS FOR HEAT $8,115 $24,400 Not Implemented
AT0096 # 01 Y:1988 01 1988 RECOVER AND REUSE COOLING WATER $47,649 $18,500 Implemented
KU0243 # 08 Y:1988 08 1988 MINIMIZE WATER USAGE $1,298 $1,320 Not Implemented
OR0017 # 07 Y:1988 07 1988 RECOVER AND REUSE COOLING WATER $502 $320 Not Implemented
AM0018 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN WATER LINES AND VALVES $162 $70 Implemented
AM0018 # 05 Y:1988 05 1988 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $773 $280 Not Implemented
UD0253 # 02 Y:1988 02 1988 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $15,536 $20,000 Implemented
OR0015 # 09 Y:1987 09 1987 MINIMIZE WATER USAGE $4,910 $9,364 Implemented
UD0247 # 02 Y:1988 02 1988 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,816 $0 Implemented
AM0013 # 04 Y:1987 04 1987 ELIMINATE LEAKS IN WATER LINES AND VALVES $113 $100 Implemented
CO0101 # 09 Y:1987 09 1987 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $9,000 $0 Not Implemented
OR0006 # 03 Y:1987 03 1987 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $8,718 $1,000 Implemented
OR0006 # 04 Y:1987 04 1987 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $25,130 $7,000 Not Implemented
UD0243 # 01 Y:1988 01 1988 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,000 $10,000 Implemented
AM0006 # 02 Y:1987 02 1987 REDUCE OR ELIMINATE WASTE $1,998 $260 Implemented