IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
ARC 3. WASTE MINIMIZATION / POLLUTION PREVENTION
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0421 # 08 Y:2007 08 2007 MINIMIZE WATER USAGE $10,056 $400 Implemented
OR0523 # 03 Y:2007 03 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,350,000 $32,700 Not Implemented
OR0523 # 01 Y:2007 01 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,000 $60,000 Implemented
UM0331 # 01 Y:2007 01 2007 RECOVER AND REUSE WASTE MATERIAL $37,752 $38,000 Not Implemented
UD0769 # 15 Y:2007 15 2007 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,800 $500 Implemented
AM0535 # 05 Y:2007 05 2007 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $2,570 $760 Implemented
DL0008 # 05 Y:2007 05 2007 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $18,000 $1,000 Implemented
NC0370 # 06 Y:2007 06 2007 MINIMIZE WATER USAGE $74,891 $121,780 Not Implemented
UD0767 # 01 Y:2007 01 2007 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $30,284 $1,500 Implemented
GT0842 # 06 Y:2007 06 2007 USE WATER-BASED ADHESIVES $1,960 $0 Implemented
CO0606 # 04 Y:2007 04 2007 USE EVAPORATION TO CONCENTRATE MATERIAL $1,060 $3,000 Not Implemented
SU0256 # 09 Y:2007 09 2007 REPLACE TREATED WATER WITH WELL / SURFACE WATER $243,880 $767,215 Not Implemented
AM0532 # 01 Y:2007 01 2007 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $9,500 $6,500 Implemented
IA0413 # 12 Y:2007 12 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $31,051 $4,000 Implemented
SU0258 # 08 Y:2007 08 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $213,621 $114,259 Not Implemented
UF0405 # 13 Y:2007 13 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,175 $8,000 Not Implemented
UF0405 # 12 Y:2007 12 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $595 $3,486 Not Implemented
IC0131 # 15 Y:2007 15 2007 MINIMIZE WATER USAGE $7,267 $15,000 Implemented
IC0131 # 17 Y:2007 17 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $5,723 $15,000 Implemented
IA0412 # 09 Y:2007 09 2007 REDUCE SCRAP PRODUCTION $33,433 $4,000 Not Implemented
BD0330 # 11 Y:2007 11 2007 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $307,692 $5,801 Implemented
LE0260 # 07 Y:2007 07 2007 MINIMIZE WATER USAGE $1,524 $1,000 Not Implemented
LE0260 # 06 Y:2007 06 2007 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,799 $2,500 Not Implemented
UM0321 # 06 Y:2007 06 2007 TREAT AND REUSE RINSE WATERS $3,084 $8,021 Not Implemented
OR0518 # 01 Y:2007 01 2007 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $51,600 $120,000 Not Implemented