IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,719

matching recommendations
Reset
ARC 4 DIRECT PRODUCTIVITY ENHANCEMENTS
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0267 # 11 Y:1997 11 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $103,520 $240,000 n/a
MA0381 # 01 Y:1997 01 1997 INSTALL SYSTEM TO COLLECT SCRAP $62,985 $16,000 Implemented
MA0381 # 02 Y:1997 02 1997 INSTALL SENSORS TO DETECT AND AVOID JAMS $21,374 $1,500 Not Implemented
MA0381 # 03 Y:1997 03 1997 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $2,000 $0 Not Implemented
HO0140 # 06 Y:1997 06 1997 CHANGE OPERATING CONDITIONS $25,000 $0 Not Implemented
KG0076 # 08 Y:1997 08 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $1,557,504 $4,414 n/a
TN0597 # 01 Y:1997 01 1997 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $420,000 $0 Implemented
OK0513 # 09 Y:1997 09 1997 MOVE PRODUCT USING MECHANICAL MEANS $46,860 $72,000 Implemented
NC0097 # 08 Y:1996 08 1996 INSTALL SYSTEM TO COLLECT SCRAP $20,250 $1,000 Not Implemented
NC0097 # 09 Y:1996 09 1996 EXPAND OPERATIONS INTO UNUSED SPACE $13,475 $0 Not Implemented
UD0508 # 08 Y:1996 08 1996 INSTALL AN UNINTERUPTABLE POWER SUPPLY $135,600 $222,868 Implemented
CO0379 # 01 Y:1996 01 1996 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,440 $48,250 Implemented
CO0379 # 02 Y:1996 02 1996 INSTALL CONTINUOUS LUBRICATION EQUIPMENT $32,640 $3,000 Implemented
CO0379 # 03 Y:1996 03 1996 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $29,180 $270 Implemented
ND0259 # 11 Y:1996 11 1996 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $53,610 $15,230 Implemented
ND0266 # 09 Y:1996 09 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $53,783 $23,845 Implemented
ME0205 # 01 Y:1996 01 1996 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $115,428 $0 Implemented
NV0072 # 09 Y:1996 09 1996 ADOPT IN-HOUSE MATERIAL GENERATION $46,800 $600 Not Implemented
CO0378 # 02 Y:1996 02 1996 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,590 $630 Implemented
CO0377 # 01 Y:1996 01 1996 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $517,560 $5,000 Not Implemented
UL0170 # 06 Y:1996 06 1996 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $960 $0 Not Implemented
UF0163 # 07 Y:1996 07 1996 INSTALL EQUIPMENT TO MOVE PRODUCT $10,057 $6,250 Not Implemented
UF0163 # 08 Y:1996 08 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $8,475 $8,488 Implemented
UM0072 # 06 Y:1996 06 1996 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $2,500 $80 Not Implemented
NV0069 # 08 Y:1996 08 1996 ADOPT IN-HOUSE MATERIAL GENERATION $31,200 $2,000 Not Implemented