IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0516 # 07 Y:2018 07 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $32,827 $20,000 Implemented
SF0516 # 08 Y:2018 08 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,367 $15,956 Implemented
MZ0250 # 01 Y:2018 01 2018 RECOVER WASTE HEAT FROM EQUIPMENT $2,351 $5,600 Implemented
UD0983 # 07 Y:2018 07 2018 INSTALL / REPAIR INSULATION ON STEAM LINES $819 $1,100 Implemented
UD0983 # 08 Y:2018 08 2018 USE OPTIMUM TEMPERATURE $355 $0 Implemented
OK0986 # 01 Y:2018 01 2018 REPAIR AND ELIMINATE STEAM LEAKS $107,913 $4,800 Implemented
WV0557 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $65,760 $117,200 Implemented
WV0557 # 02 Y:2018 02 2018 REPAIR AND ELIMINATE STEAM LEAKS $43,281 $33,600 Implemented
IP0099 # 06 Y:2018 06 2018 INSULATE BARE EQUIPMENT $239 $603 Implemented
MI0326 # 03 Y:2018 03 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,537 $28,750 Implemented
AM0746 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $2,200 $890 Implemented
NC0608 # 08 Y:2018 08 2018 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $29,926 $2,000 Implemented
NL0018 # 02 Y:2018 02 2018 USE OPTIMUM TEMPERATURE $9,300 $210 Implemented
WV0556 # 13 Y:2018 13 2018 INSULATE BARE EQUIPMENT $717 $604 Implemented
UA0189 # 03 Y:2018 03 2018 USE MINIMUM STEAM OPERATING PRESSURE $3,482 $50 Implemented
AM0743 # 08 Y:2018 08 2018 USE MINIMUM STEAM OPERATING PRESSURE $280 $13 Implemented
UD0981 # 08 Y:2018 08 2018 INSULATE BARE EQUIPMENT $6,131 $4,525 Implemented
LE0448 # 08 Y:2018 08 2018 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $6,258 $30,000 Implemented
SF0513 # 02 Y:2018 02 2018 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $177,909 $41,250 Implemented
SF0513 # 05 Y:2018 05 2018 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $64,975 $191,474 Implemented
GT0911 # 03 Y:2018 03 2018 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $310 $180 Implemented
NC0607 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $468 $1,500 Implemented
NC0606 # 08 Y:2018 08 2018 REPAIR OR REPLACE STEAM TRAPS $11,945 $10,500 Implemented
IP0096 # 08 Y:2018 08 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,917 $12,782 Implemented
IP0096 # 09 Y:2018 09 2018 USE OPTIMUM THICKNESS INSULATION $18,548 $984 Implemented