IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,408

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0513 # 07 Y:2017 07 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $2,443 $1,481 Implemented
LS0012 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $993 $548 Not Implemented
MZ0241 # 02 Y:2017 02 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,238 $3,570 Implemented
MZ0241 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,547 $4,050 Implemented
TR0005 # 01 Y:2017 01 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,452 $6,500 Implemented
TR0005 # 02 Y:2017 02 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,056 $417 Not Implemented
TR0005 # 09 Y:2017 09 2017 ISOLATE HOT OR COLD EQUIPMENT $292 $1,422 Not Implemented
TR0005 # 10 Y:2017 10 2017 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $8,320 $966 Implemented
TT0200 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $6,931 $15,000 Not Implemented
OR0695 # 02 Y:2017 02 2017 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $13,796 $30,600 Not Implemented
OR0695 # 03 Y:2017 03 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,279 $43,386 Implemented
GT0908 # 03 Y:2017 03 2017 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $25,748 $19,769 Not Implemented
MI0325 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,058 $9,700 Not Implemented
MI0325 # 05 Y:2017 05 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,801 $160 Implemented
MI0325 # 08 Y:2017 08 2017 USE OPTIMUM THICKNESS INSULATION $1,467 $388 Implemented
BS0108 # 02 Y:2017 02 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,658 $290 Not Implemented
MI0324 # 01 Y:2017 01 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $94,097 $134,000 Not Implemented
NL0015 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $5,079 $12,500 Not Implemented
BS0107 # 01 Y:2017 01 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $4,338 $5,117 Not Implemented
UU0124 # 05 Y:2017 05 2017 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $1,833 $4,266 Not Implemented
UD0978 # 06 Y:2017 06 2017 USE OPTIMUM THICKNESS INSULATION $86,982 $91,480 Not Implemented
UD0978 # 07 Y:2017 07 2017 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $37,937 $100,000 Not Implemented
UD0978 # 08 Y:2017 08 2017 COVER OPEN TANKS $7,466 $5,000 Not Implemented
TT0199 # 02 Y:2017 02 2017 REPAIR OR REPLACE STEAM TRAPS $14,682 $4,830 Not Implemented
WM0113 # 06 Y:2017 06 2017 INSULATE BARE EQUIPMENT $684 $1,000 Not Implemented