IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

233

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0811 # 06 Y:2005 06 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,877 $1,300 Implemented
GT0811 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $28,824 $20,700 Implemented
IC0110 # 03 Y:2005 03 2005 REPAIR OR REPLACE STEAM TRAPS $29,831 $1,638 Implemented
IC0110 # 04 Y:2005 04 2005 REPAIR AND ELIMINATE STEAM LEAKS $6,051 $400 Implemented
UF0370 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $4,053 $1,317 Implemented
UF0370 # 09 Y:2005 09 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $47,299 $130,000 Implemented
AS0411 # 06 Y:2005 06 2005 REPAIR AND ELIMINATE STEAM LEAKS $4,077 $8,000 Implemented
NC0330 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $22,562 $8,181 Implemented
MA0585 # 05 Y:2005 05 2005 USE MINIMUM STEAM OPERATING PRESSURE $29,239 $23,014 Implemented
TA0108 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $2,910 $495 Implemented
SF0317 # 07 Y:2005 07 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,370 $50,000 Implemented
SF0316 # 01 Y:2005 01 2005 REPAIR AND ELIMINATE STEAM LEAKS $4,516 $0 Implemented
UF0368 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $194 $65 Implemented
UF0368 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,437 $1,407 Implemented
NC0327 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $410 $820 Implemented
UM0291 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,293 $9,000 Implemented
UM0291 # 03 Y:2005 03 2005 COVER OPEN TANKS $4,518 $2,366 Implemented
CO0577 # 05 Y:2005 05 2005 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $3,420 $6,000 Implemented
SU0222 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $5,727 $142 Implemented
SF0315 # 02 Y:2005 02 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $2 $206 Implemented
WV0327 # 13 Y:2005 13 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $224 $120 Implemented
WV0327 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,323 $3,960 Implemented
WV0327 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $11,686 $2,140 Implemented
TA0103 # 02 Y:2005 02 2005 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,365 $2,620 Implemented
OK0717 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $1,466 $1,039 Implemented