IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,064

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0481 # 04 Y:2020 04 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,159 $9,000 Not Implemented
UD1014 # 03 Y:2020 03 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $23,635 $0 Not Implemented
UD1014 # 04 Y:2020 04 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $15,013 $21,000 Not Implemented
LE0491 # 03 Y:2020 03 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $43,832 $60,000 Not Implemented
LS2005 # 06 Y:2020 06 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $225,476 $1,204,486 Not Implemented
UU0162 # 04 Y:2020 04 2020 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $328 $1,141 Implemented
UD1012 # 08 Y:2020 08 2020 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $46,434 $0 Not Implemented
UD1012 # 06 Y:2020 06 2020 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $67,773 $0 Implemented
UD1012 # 09 Y:2020 09 2020 UTILIZE A LESS EXPENSIVE COOLING METHOD $27,338 $0 Implemented
GT0940 # 02 Y:2020 02 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $956 $250 Not Implemented
DL0179 # 08 Y:2020 08 2020 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $65,500 $47,500 Not Implemented
UD1010 # 03 Y:2020 03 2020 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $7,123 $5,000 Not Implemented
UD1009 # 07 Y:2020 07 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $73,844 $147,736 Not Implemented
UD1009 # 06 Y:2020 06 2020 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $100,517 $151,300 Not Implemented
UD1008 # 06 Y:2019 06 2019 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $8,111 $13,455 Not Implemented
UD1008 # 07 Y:2019 07 2019 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $5,658 $0 Not Implemented
UD1008 # 08 Y:2019 08 2019 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $3,596 $0 Not Implemented
UD1007 # 04 Y:2019 04 2019 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $80,784 $10,000 Not Implemented
UD1007 # 05 Y:2019 05 2019 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $4,980 $0 Implemented
UD1007 # 03 Y:2019 03 2019 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $87,749 $5,000 Not Implemented
NC0643 # 03 Y:2019 03 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $13,881 $30,000 Not Implemented
BS0132 # 08 Y:2019 08 2019 AVOID FROST FORMATION ON EVAPORATORS $3,938 $2,781 Not Implemented
UD1006 # 02 Y:2019 02 2019 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $125,929 $30,000 Not Implemented
UD1006 # 03 Y:2019 03 2019 UTILIZE A LESS EXPENSIVE COOLING METHOD $27,201 $54,202 Not Implemented
UK1912 # 07 Y:2019 07 2019 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $16,009 $41,650 Not Implemented