Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,845

matching recommendations
Reset
ARC 2.3 Electrical Power
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0592 # 01 Y:2023 01 2023 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $73,113 $215,600 Not Implemented
AM0877 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $35,600 $148,000 Implemented
UF0592 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $56,023 $88,370 Implemented
UC2303 # 09 Y:2023 09 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $11,455 $55,867 Not Implemented
KS2313 # 05 Y:2023 05 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $106,263 $627,000 Not Implemented
WM0197 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $14,680 $41,043 Implemented
UA0269 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $3,634 $842 Not Implemented
SD0631 # 02 Y:2023 02 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $15,108 $70,650 Not Implemented
CI0007 # 05 Y:2023 05 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,887 $50 Not Implemented
IP0170 # 04 Y:2023 04 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,289 $660 Not Implemented
WV0639 # 02 Y:2023 02 2023 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $76,363 $381,250 Not Implemented
AM0876 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $20,029 $25,217 Implemented
KS2311 # 06 Y:2023 06 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $66,324 $627,000 Not Implemented
GT0964 # 02 Y:2023 02 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $142,026 $175,000 Not Implemented
UF0591 # 01 Y:2023 01 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $460,292 $1,330,000 Not Implemented
GT0964 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $1,788 $8,500 Not Implemented
UF0591 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $48,128 $44,635 Implemented
SU0529 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,834 $0 Not Implemented
MI0419 # 02 Y:2023 02 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $19,853 $37,026 Implemented
UD1053 # 09 Y:2023 09 2023 OPTIMIZE PLANT POWER FACTOR $46,233 $119,156 Not Implemented
MA0852 # 04 Y:2023 04 2023 USE EXISTING DAM TO GENERATE ELECTRICITY $20,149 $203,280 Not Implemented
UF0590 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $101,164 $60,322 Not Implemented
NT0002 # 02 Y:2023 02 2023 OPTIMIZE PLANT POWER FACTOR $14,389 $21,853 Not Implemented
CW0126 # 06 Y:2022 06 2022 USE POWER DURING OFF-PEAK PERIODS $921 $0 n/a
CC0013 # 03 Y:2023 03 2023 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE $4,697 $8,400 n/a