Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,518
matching recommendationsARC | 3 | WASTE MINIMIZATION / POLLUTION PREVENTION |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD1082 # 02 Y:2024 | 02 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,315 | $760 | n/a |
UD1081 # 10 Y:2024 | 10 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $621 | $249 | n/a |
MI0438 # 04 Y:2024 | 04 | 2024 | METER WASTE WATER | $26,088 | $956 | n/a |
AM0917 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $362 | $3,000 | n/a |
UW2402 # 05 Y:2024 | 05 | 2024 | USE OTHER WASTE CONCENTRATION METHODS | $25,000 | $104,000 | n/a |
MZ0356 # 09 Y:2023 | 09 | 2023 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $10,677 | $100,000 | n/a |
MZ0356 # 08 Y:2023 | 08 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $7,202 | $7,540 | n/a |
SF0614 # 01 Y:2024 | 01 | 2024 | MINIMIZE WATER USAGE | $26,559 | $990 | n/a |
UA0283 # 06 Y:2023 | 06 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $12,662 | $6,036 | n/a |
SF0614 # 08 Y:2024 | 08 | 2024 | MINIMIZE WATER USAGE | $30,298 | $117,500 | n/a |
TT0309 # 09 Y:2024 | 09 | 2024 | METER WASTE WATER | $4,799 | $1,100 | n/a |
IP0180 # 04 Y:2023 | 04 | 2023 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $4,518 | $5,490 | n/a |
UA0281 # 02 Y:2023 | 02 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $14,808 | $5,698 | n/a |
MI0434 # 06 Y:2023 | 06 | 2023 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $3,200 | $3,460 | n/a |
AM0899 # 01 Y:2024 | 01 | 2024 | MAINTAIN MACHINES TO REDUCE LEAKS | $4,537 | $5,000 | n/a |
OR0784 # 01 Y:2023 | 01 | 2023 | USE OTHER WASTE CONCENTRATION METHODS | $61,484 | $125,000 | n/a |
UC2316 # 03 Y:2023 | 03 | 2023 | RECOVER AND REUSE WASTE MATERIAL | $76,811 | $332,613 | n/a |
MU0040 # 04 Y:2023 | 04 | 2023 | MINIMIZE WATER USAGE | $68,486 | $150,124 | n/a |
TT0306 # 03 Y:2024 | 03 | 2024 | TREAT AND REUSE RINSE WATERS | $3,460 | $1,590 | n/a |
AM0893 # 01 Y:2024 | 01 | 2024 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $70,280 | $188,400 | n/a |
AM0896 # 04 Y:2024 | 04 | 2024 | MAINTAIN MACHINES TO REDUCE LEAKS | $1,625 | $5,000 | n/a |
WM0207 # 02 Y:2024 | 02 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $16,759 | $2,500 | n/a |
UA0278 # 01 Y:2023 | 01 | 2023 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $83,920 | $6,036 | n/a |
DL0231 # 06 Y:2024 | 06 | 2024 | MAINTAIN MACHINES TO REDUCE LEAKS | $441,845 | $39,600 | n/a |
DL0231 # 05 Y:2024 | 05 | 2024 | MAINTAIN MACHINES TO REDUCE LEAKS | $132,876 | $34,600 | n/a |