IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,575

matching recommendations
Reset
ARC 3 WASTE MINIMIZATION / POLLUTION PREVENTION
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0567 # 03 Y:2018 03 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,322 $15,000 Not Implemented
NC0623 # 04 Y:2018 04 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,478 $16,800 Implemented
LS1817 # 01 Y:2018 01 2018 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $3,865 $315 Not Implemented
MZ0259 # 03 Y:2018 03 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $140,488 $304,000 Not Implemented
MZ0259 # 04 Y:2018 04 2018 RECOVER AND REUSE COOLING WATER $63,427 $203,000 Implemented
OR0710 # 02 Y:2018 02 2018 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $31,220 $60,550 Not Implemented
UF0521 # 10 Y:2018 10 2018 MAKE A NEW BY-PRODUCT $243,164 $58,810 Implemented
UK1811 # 02 Y:2018 02 2018 ELIMINATE/REDUCE AN OPERATION $2,899 $0 Not Implemented
OR0709 # 01 Y:2018 01 2018 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $60,750 $77,700 Not Implemented
AS0461 # 01 Y:2018 01 2018 RECOVER AND REUSE WASTE MATERIAL $11,063 $0 Not Implemented
BS0114 # 02 Y:2018 02 2018 CONVERT TO ELECTROSTATIC POWDER COATING $26,520 $21,600 Implemented
UK1810 # 02 Y:2018 02 2018 ELIMINATE/REDUCE AN OPERATION $21,029 $10,000 Not Implemented
UK1810 # 04 Y:2018 04 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,700 $5,900 Implemented
UK1810 # 06 Y:2018 06 2018 REPLACE TREATED WATER WITH WELL / SURFACE WATER $22,528 $8,200 Implemented
IC0208 # 02 Y:2018 02 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $18,213 $1,050 Not Implemented
SU0470 # 07 Y:2018 07 2018 ELIMINATE/REDUCE AN OPERATION $4,262 $2,880 Not Implemented
AM0764 # 01 Y:2018 01 2018 USE EVAPORATION TO CONCENTRATE MATERIAL $13,350 $7,000 Not Implemented
SU0469 # 02 Y:2018 02 2018 ELIMINATE/REDUCE AN OPERATION $6,208 $888 Not Implemented
UK1808 # 05 Y:2018 05 2018 REPLACE TREATED WATER WITH WELL / SURFACE WATER $11,910 $3,700 Not Implemented
AM0763 # 01 Y:2018 01 2018 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $327,000 $0 Not Implemented
AM0763 # 05 Y:2018 05 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $45,525 $8,000 Not Implemented
UD0992 # 01 Y:2018 01 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $14,245 $700 Implemented
IP0108 # 03 Y:2018 03 2018 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,119 $600 Not Implemented
UK1806 # 13 Y:2018 13 2018 USE PLASTIC PALLETS INSTEAD OF WOOD $8,000 $18,890 n/a
SU0467 # 03 Y:2018 03 2018 ELIMINATE/REDUCE AN OPERATION $6,396 $3,593 Implemented