Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,671
matching recommendationsARC | 3. | WASTE MINIMIZATION / POLLUTION PREVENTION |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0581 # 07 Y:2025 | 07 | 2025 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,877 | $1,220 | n/a |
NL0113 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $58,063 | $520 | n/a |
NL0113 # 04 Y:2025 | 04 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $43,590 | $52,034 | n/a |
LS2517 # 01 Y:2025 | 01 | 2025 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $16,005 | $0 | n/a |
UD1118 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $23,759 | $18,000 | n/a |
MU0072 # 08 Y:2025 | 08 | 2025 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $640 | $0 | n/a |
TT0335 # 04 Y:2025 | 04 | 2025 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $263,515 | $80,000 | n/a |
TT0335 # 07 Y:2025 | 07 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,933 | $9,000 | n/a |
WV0688 # 06 Y:2025 | 06 | 2025 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,913 | $21,336 | n/a |
UU0275 # 03 Y:2025 | 03 | 2025 | USE AUTOMATIC FLOW CONTROL | $1,516 | $5,258 | n/a |
IP0214 # 01 Y:2025 | 01 | 2025 | CONVERT TO ELECTROSTATIC POWDER COATING | $114,298 | $0 | n/a |
IP0214 # 08 Y:2025 | 08 | 2025 | USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING | $9,428 | $9,599 | n/a |
UD1115 # 03 Y:2025 | 03 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,016 | $760 | n/a |
LS2515 # 01 Y:2025 | 01 | 2025 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $12,408 | $0 | n/a |
UW2508 # 04 Y:2025 | 04 | 2025 | INSTALL DEDICATED MIXING EQUIP TO OPTIMIZE REUSE OF USED RINSEATE & TO PRECLUDE THE NEED FOR INTER-RUN CLEANING | $116,528 | $582,640 | n/a |
UW2507 # 06 Y:2025 | 06 | 2025 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $124,957 | $342,000 | n/a |
UF0632 # 11 Y:2025 | 11 | 2025 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $3,839 | $3,079 | n/a |
LS2513 # 01 Y:2025 | 01 | 2025 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $12,200 | $0 | n/a |
WV0682 # 02 Y:2025 | 02 | 2025 | MINIMIZE WATER USAGE | $71,374 | $60,060 | n/a |
MS0449 # 06 Y:2025 | 06 | 2025 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $21,369 | $10,437 | n/a |
MS0449 # 05 Y:2025 | 05 | 2025 | RECOVER AND REUSE WASTE MATERIAL | $24,000 | $14,060 | n/a |
TT0331 # 02 Y:2025 | 02 | 2025 | MINIMIZE WATER USAGE | $1,508 | $400 | n/a |
MZ0377 # 07 Y:2025 | 07 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $31,698 | $9,040 | n/a |
DL0259 # 01 Y:2025 | 01 | 2025 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $45,458 | $19,000 | n/a |
UU0271 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $771 | $5,877 | n/a |