IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20,400

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0527 # 06 Y:2022 06 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,260 $8,500 Not Implemented
LE0527 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,154 $160,000 Implemented
AS0521 # 06 Y:2022 06 2022 USE OPTIMUM THICKNESS INSULATION $13 $109 Implemented
TT0275 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,643 $2,500 Not Implemented
OK1074 # 05 Y:2022 05 2022 INSULATE BARE EQUIPMENT $1,700 $611 Not Implemented
IP0158 # 03 Y:2022 03 2022 USE OPTIMUM TEMPERATURE $2,592 $14 Implemented
IP0158 # 11 Y:2022 11 2022 USE OPTIMUM TEMPERATURE $837 $763 Not Implemented
UD1040 # 01 Y:2022 01 2022 COVER OPEN TANKS $3,104 $0 Not Implemented
LE0526 # 04 Y:2022 04 2022 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,817 $1,200 Not Implemented
WV0623 # 09 Y:2022 09 2022 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,154 $13,600 Not Implemented
MZ0327 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $13,649 $16,300 Not Implemented
GT0960 # 04 Y:2021 04 2021 UTILIZE A LESS EXPENSIVE COOLING METHOD $39,614 $149,000 Not Implemented
UD1039 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $1,123 $714 Not Implemented
UD1039 # 07 Y:2022 07 2022 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,304 $2,369 Not Implemented
UF0578 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $9,829 $2,419 Implemented
UF0578 # 05 Y:2022 05 2022 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $7,688 $0 Implemented
SF0585 # 03 Y:2022 03 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $23,840 $8,000 Not Implemented
TT0273 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $51,693 $8,551 Not Implemented
TT0273 # 07 Y:2022 07 2022 INSULATE BARE EQUIPMENT $1,084 $428 Not Implemented
MUCM02 # 04 Y:2022 04 2022 INSULATE BARE EQUIPMENT $1,179 $580 Implemented
AM0849 # 02 Y:2022 02 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $1,157 $360 Implemented
AM0849 # 07 Y:2022 07 2022 REPAIR OR REPLACE STEAM TRAPS $6,765 $560 Implemented
UD1038 # 05 Y:2022 05 2022 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $26,728 $32,000 Not Implemented
CW0123 # 05 Y:2022 05 2022 USE OPTIMUM TEMPERATURE $4,521 $3,500 n/a
LE0524 # 02 Y:2022 02 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $131,350 $40,000 Implemented