IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,092

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0704 # 04 Y:2015 04 2015 AVOID FROST FORMATION ON EVAPORATORS $1,750 $1,890 Not Implemented
BS0049 # 02 Y:2015 02 2015 AVOID FROST FORMATION ON EVAPORATORS $102,865 $70,430 Not Implemented
WV0502 # 05 Y:2015 05 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,333 $2,500 Not Implemented
SF0459 # 03 Y:2015 03 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $196,316 $40,788 Not Implemented
MI0272 # 02 Y:2015 02 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $59,120 $60,000 Not Implemented
LE0390 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $47,479 $25,500 Implemented
WM0061 # 07 Y:2015 07 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $721 $2,000 Not Implemented
MA0740 # 03 Y:2015 03 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,672 $11,200 Implemented
SD0494 # 05 Y:2015 05 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,199 $2,199 Not Implemented
MI0269 # 01 Y:2014 01 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $33,693 $150,000 Implemented
SF0455 # 08 Y:2014 08 2014 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $13,254 $19,582 Implemented
CO0697 # 01 Y:2014 01 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,320 $29,550 Not Implemented
DL0134 # 02 Y:2014 02 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $41,430 $54,000 Implemented
NC0523 # 08 Y:2014 08 2014 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $11,195 $20,000 Not Implemented
BS0044 # 04 Y:2014 04 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $26,828 $9,000 Implemented
SU0372 # 08 Y:2014 08 2014 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $20,087 $56,082 Not Implemented
SU0372 # 03 Y:2014 03 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,896 $380 Not Implemented
BS0043 # 01 Y:2014 01 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $63,855 $15,000 Implemented
MI0268 # 01 Y:2014 01 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $139,206 $330,000 Not Implemented
BD0449 # 01 Y:2014 01 2014 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $64,237 $1,500,000 Implemented
WM0054 # 03 Y:2014 03 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,335 $10,000 Not Implemented
MZ0157 # 04 Y:2014 04 2014 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,223 $17,400 Not Implemented
MI0267 # 01 Y:2014 01 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $18,615 $80,000 Implemented
OR0636 # 03 Y:2014 03 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,708 $7,000 Implemented
OK0889 # 02 Y:2014 02 2014 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $4,415 $7,547 Not Implemented