IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,125

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0376 # 01 Y:2000 01 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $77,809 $157,500 Not Implemented
WV0201 # 11 Y:2000 11 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,887 $40 Implemented
WV0201 # 10 Y:2000 10 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,435 $530 Not Implemented
WV0199 # 02 Y:2000 02 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,354 $2,088 Implemented
MA0467 # 02 Y:2000 02 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $6,077 $4,000 Implemented
UD0599 # 03 Y:2000 03 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,987 $20,000 Implemented
GT0691 # 01 Y:2000 01 2000 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $16,970 $35,000 Not Implemented
WI0378 # 05 Y:2000 05 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,844 $14,500 Not Implemented
TN0688 # 03 Y:2000 03 2000 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $29,380 $27,925 Not Implemented
TN0688 # 04 Y:2000 04 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $23,435 $12,800 Not Implemented
NC0189 # 05 Y:2000 05 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,045 $600 Not Implemented
NC0189 # 06 Y:2000 06 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,905 $15,000 Not Implemented
SF0191 # 03 Y:2000 03 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,529 $32,232 Not Implemented
MA0460 # 04 Y:2000 04 2000 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $5,388 $13,800 Implemented
SD0247 # 04 Y:2000 04 2000 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $5,628 $3,000 Not Implemented
WV0189 # 02 Y:2000 02 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,448 $0 Not Implemented
SD0243 # 01 Y:2000 01 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,132 $28,575 Not Implemented
WI0371 # 07 Y:2000 07 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,030 $6,090 Not Implemented
TN0676 # 03 Y:2000 03 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $6,275 $18,200 Implemented
WV0187 # 06 Y:2000 06 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $569 $300 Not Implemented
MA0458 # 05 Y:2000 05 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $757 $1,000 Implemented
SD0237 # 01 Y:2000 01 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,985 $88,000 Implemented
WI0366 # 01 Y:2000 01 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $23,840 $71,500 Not Implemented
WI0365 # 03 Y:2000 03 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,830 $26,500 Implemented
WV0182 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,200 $70 Implemented