IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,125

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0267 # 04 Y:1996 04 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $13,635 $39,000 n/a
MA0360 # 03 Y:1996 03 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,904 $26,500 Not Implemented
IA0138 # 01 Y:1996 01 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,803 $7,955 Implemented
NC0079 # 04 Y:1996 04 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,117 $3,000 Not Implemented
NC0085 # 01 Y:1996 01 1996 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $144 $0 Not Implemented
WI0265 # 08 Y:1996 08 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $954 $4,000 Not Implemented
SD0141 # 03 Y:1996 03 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,057 $2,600 Not Implemented
WV0089 # 08 Y:1996 08 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,810 $10,600 Not Implemented
KG0055 # 02 Y:1996 02 1996 AVOID FROST FORMATION ON EVAPORATORS $6,153 $0 Implemented
KG0053 # 02 Y:1996 02 1996 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $12,871 $6,433 Not Implemented
OD0054 # 02 Y:1996 02 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $24,554 $66,950 Not Implemented
NC0086 # 05 Y:1996 05 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $831 $2,475 Not Implemented
NC0084 # 06 Y:1996 06 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,221 $5,100 Not Implemented
NC0084 # 12 Y:1996 12 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $25,015 $18,000 Implemented
MA0358 # 05 Y:1996 05 1996 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $377 $0 Not Implemented
AS0168 # 06 Y:1996 06 1996 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $11,824 $0 Implemented
AS0168 # 07 Y:1996 07 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,044 $20,000 Not Implemented
OR0258 # 02 Y:1996 02 1996 UTILIZE A LESS EXPENSIVE COOLING METHOD $24,560 $120,600 Not Implemented
OR0258 # 01 Y:1996 01 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,070 $0 Not Implemented
WI0256 # 06 Y:1996 06 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,370 $5,000 Not Implemented
NC0078 # 03 Y:1996 03 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $14,370 $7,500 Implemented
NC0078 # 04 Y:1996 04 1996 UTILIZE A LESS EXPENSIVE COOLING METHOD $5,344 $0 Implemented
UF0139 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,271 $35,000 Not Implemented
SD0138 # 03 Y:1996 03 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,627 $1,495 Not Implemented
WV0079 # 03 Y:1996 03 1996 UTILIZE A LESS EXPENSIVE COOLING METHOD $19,407 $65,000 Not Implemented