Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
Reset
ARC 2.3 Electrical Power
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0117 # 03 Y:2020 03 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $621 $1,288 Not Implemented
AM0817 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $4,170 $12,500 Not Implemented
IP0143 # 05 Y:2020 05 2020 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $474 $461 Not Implemented
GT0953 # 06 Y:2020 06 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $38,010 $172,500 Implemented
UF0557 # 07 Y:2020 07 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,282 $25,340 Implemented
CL2016 # 05 Y:2020 05 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $967 $400 Not Implemented
IP0142 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $14,194 $1,910 Not Implemented
UD1025 # 07 Y:2020 07 2020 OPTIMIZE PLANT POWER FACTOR $3,612 $7,325 Not Implemented
NC0655 # 02 Y:2020 02 2020 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $49,654 $612,000 Not Implemented
GT0952 # 09 Y:2020 09 2020 OPTIMIZE PLANT POWER FACTOR $300 $1,565 Not Implemented
GT0952 # 05 Y:2020 05 2020 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,728 $400 Not Implemented
AM0815 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $2,600 $3,770 Not Implemented
NC0654 # 01 Y:2020 01 2020 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $1,381,024 $8,000,000 Not Implemented
CO0739 # 06 Y:2020 06 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,090 $0 Implemented
AM0814 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $6,460 $9,830 Not Implemented
AM0813 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $9,070 $14,280 Not Implemented
UA0234 # 02 Y:2020 02 2020 OPTIMIZE PLANT POWER FACTOR $1,608 $7,769 Not Implemented
LS2007 # 08 Y:2020 08 2020 OPTIMIZE PLANT POWER FACTOR $8,178 $56,728 Not Implemented
LS2007 # 02 Y:2020 02 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $67,360 $13,000 Not Implemented
GT0951 # 08 Y:2020 08 2020 OPTIMIZE PLANT POWER FACTOR $9,097 $34,730 Not Implemented
GT0951 # 09 Y:2020 09 2020 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $201,113 $1,989,215 Not Implemented
AM0812 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $2,250 $3,410 Implemented
NL0053 # 08 Y:2020 08 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,080 $56 Implemented
TT0246 # 08 Y:2020 08 2020 OPTIMIZE PLANT POWER FACTOR $5,728 $12,000 Not Implemented
IC0243 # 01 Y:2020 01 2020 USE EXISTING DAM TO GENERATE ELECTRICITY $1,582 $31,846 Not Implemented