IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

10,575

matching recommendations
Reset
ARC 3 WASTE MINIMIZATION / POLLUTION PREVENTION
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0832 # 08 Y:2011 08 2011 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $5,424 $500 Implemented
NC0420 # 07 Y:2011 07 2011 USE AUTOMATIC FLOW CONTROL $377,830 $3,425 Not Implemented
SU0306 # 06 Y:2011 06 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,700 $35,000 Not Implemented
SU0306 # 03 Y:2011 03 2011 RECOVER AND REUSE SPENT ACID BATHS $49,465 $4,029 Implemented
SU0306 # 05 Y:2011 05 2011 RECOVER AND REUSE COOLING WATER $32,137 $12,052 Implemented
SU0303 # 07 Y:2011 07 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,074 $16,668 Not Implemented
AM0592 # 01 Y:2011 01 2011 MINIMIZE WATER USAGE $36,500 $20,000 Not Implemented
AM0592 # 03 Y:2011 03 2011 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $17,240 $0 Implemented
AM0592 # 04 Y:2011 04 2011 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,700 $0 Not Implemented
AM0591 # 01 Y:2011 01 2011 MINIMIZE WATER USAGE $141,000 $80,000 Not Implemented
BD0386 # 14 Y:2011 14 2011 USE EVAPORATION TO CONCENTRATE MATERIAL $6,567 $10,000 Implemented
BD0384 # 09 Y:2011 09 2011 USE EVAPORATION TO CONCENTRATE MATERIAL $949 $705 Not Implemented
UA3009 # 10 Y:2011 10 2011 METER WASTE WATER $55,751 $7,500 n/a
SU0301 # 04 Y:2011 04 2011 RECOVER AND REUSE SPENT ACID BATHS $1,049 $958 Not Implemented
SU0301 # 07 Y:2011 07 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,025 $26,043 Not Implemented
GT0876 # 02 Y:2010 02 2010 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE $307 $50 Not Implemented
GT0876 # 06 Y:2010 06 2010 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,041 $20,000 Not Implemented
MZ0061 # 08 Y:2010 08 2010 REDUCE SCRAP PRODUCTION $92,766 $100,000 Implemented
AM0585 # 02 Y:2010 02 2010 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $9,140 $0 Not Implemented
UM0377 # 09 Y:2010 09 2010 REPROCESS SPENT OILS ON SITE FOR RE-USE $626 $627 Not Implemented
AM0584 # 02 Y:2010 02 2010 INCREASE USE OF AUTOMATION $28,100 $14,000 Not Implemented
OR0563 # 04 Y:2010 04 2010 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,100,000 $2,150,000 Not Implemented
DL0062 # 07 Y:2010 07 2010 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,500 $1,000 Not Implemented
MI0197 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN WATER LINES AND VALVES $1,187 $180 Implemented
AM0582 # 07 Y:2010 07 2010 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $33,670 $2,400 Not Implemented