Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,575
matching recommendationsARC | 3 | WASTE MINIMIZATION / POLLUTION PREVENTION |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0116 # 02 Y:2006 | 02 | 2006 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $13,000 | $0 | Not Implemented |
MA0604 # 01 Y:2006 | 01 | 2006 | ELIMINATE/REDUCE AN OPERATION | $33,327 | $2,600 | Not Implemented |
UF0378 # 08 Y:2006 | 08 | 2006 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $3,397 | $507 | Implemented |
BD0311 # 07 Y:2006 | 07 | 2006 | INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE | $6,600 | $610 | Not Implemented |
BD0311 # 08 Y:2006 | 08 | 2006 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,860 | $8,000 | Not Implemented |
AM0512 # 07 Y:2006 | 07 | 2006 | REUSE RAGS UNTIL COMPLETELY SOILED | $1,300 | $0 | Not Implemented |
AM0512 # 03 Y:2006 | 03 | 2006 | RECOVER AND REUSE WASTE MATERIAL | $6,200 | $9,135 | Not Implemented |
BD0311 # 09 Y:2006 | 09 | 2006 | MINIMIZE WATER USAGE | $656 | $3,220 | Not Implemented |
GT0824 # 05 Y:2006 | 05 | 2006 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,702 | $600 | Not Implemented |
GT0822 # 01 Y:2006 | 01 | 2006 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $22,995 | $640 | Implemented |
UF0377 # 09 Y:2006 | 09 | 2006 | IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL | $4,718 | $463 | Not Implemented |
UF0377 # 10 Y:2006 | 10 | 2006 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $3,000 | $0 | Not Implemented |
AM0510 # 07 Y:2006 | 07 | 2006 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $660 | $0 | Implemented |
AM0510 # 05 Y:2006 | 05 | 2006 | RECOVER AND REUSE WASTE MATERIAL | $2,290 | $0 | Implemented |
AS0421 # 02 Y:2006 | 02 | 2006 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $3,068 | $1,500 | n/a |
SU0232 # 03 Y:2006 | 03 | 2006 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,612 | $0 | Implemented |
BD0309 # 08 Y:2006 | 08 | 2006 | RECOVER AND REUSE COOLING WATER | $25,524 | $60,000 | Not Implemented |
BD0308 # 08 Y:2006 | 08 | 2006 | MINIMIZE WATER USAGE | $254 | $1,150 | Implemented |
OR0499 # 03 Y:2006 | 03 | 2006 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,200 | $0 | Implemented |
MS0293 # 05 Y:2006 | 05 | 2006 | BURN WASTE OIL FOR HEAT | $564 | $3,595 | Not Implemented |
MA0603 # 11 Y:2006 | 11 | 2006 | BURN WASTE OIL FOR HEAT | $3,685 | $6,500 | Implemented |
AM0507 # 05 Y:2006 | 05 | 2006 | USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) | $7,616 | $25,000 | Not Implemented |
UU0100 # 05 Y:2006 | 05 | 2006 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $15,000 | $10,000 | Not Implemented |
NC0336 # 02 Y:2006 | 02 | 2006 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $8,595 | $1,300 | Not Implemented |
UD0738 # 02 Y:2006 | 02 | 2006 | RECOVER AND REUSE WASTE MATERIAL | $28,944 | $2,000 | Not Implemented |