IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
ARC 4. DIRECT PRODUCTIVITY ENHANCEMENTS
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0158 # 05 Y:2019 05 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $451 $1,100 Implemented
MZ0283 # 02 Y:2019 02 2019 ADOPT IN-HOUSE MATERIAL GENERATION $14,280 $43,150 Not Implemented
MI0363 # 05 Y:2019 05 2019 PAY BILLS ON TIME TO AVOID LATE FEES $2,859 $0 Not Implemented
OR0730 # 01 Y:2019 01 2019 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $15,651 $5,000 Not Implemented
OR0730 # 02 Y:2019 02 2019 MODIFY WORKLOAD $13,223 $18,824 Not Implemented
UF0539 # 06 Y:2019 06 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $44,758 $3,326 Not Implemented
NL0040 # 02 Y:2019 02 2019 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $38,925 $150,000 Not Implemented
MZ0285 # 03 Y:2019 03 2019 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $66,439 $129,987 Not Implemented
SU0487 # 01 Y:2019 01 2019 PAY BILLS ON TIME TO AVOID LATE FEES $1,476 $0 Not Implemented
OR0727 # 01 Y:2019 01 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,245,906 $300,000 Not Implemented
OR0725 # 01 Y:2019 01 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $16,581 $12,780 Not Implemented
WV0586 # 04 Y:2019 04 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $3,276 $11,875 Not Implemented
WV0586 # 02 Y:2019 02 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $31,539 $1,630 Implemented
OR0723 # 01 Y:2019 01 2019 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $488,033 $1,500,000 Implemented
OR0722 # 02 Y:2019 02 2019 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $17,875 $0 Implemented
OR0722 # 01 Y:2019 01 2019 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $42,047 $1,000 Implemented
WV0585 # 02 Y:2019 02 2019 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $33,124 $77,800 Not Implemented
LS1912 # 04 Y:2019 04 2019 INSTALL AUTOMATIC PACKING EQUIPMENT $1,164,856 $900,000 Not Implemented
UF0537 # 09 Y:2019 09 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $37,600 $100,000 Implemented
UF0536 # 05 Y:2019 05 2019 INSTALL AN UNINTERUPTABLE POWER SUPPLY $25,860 $33,265 Not Implemented
UU0155 # 01 Y:2019 01 2019 ADOPT IN-HOUSE MATERIAL GENERATION $102,278 $823,000 Implemented
MZ0282 # 05 Y:2019 05 2019 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $287,984 $1,030,500 Not Implemented
SU0483 # 01 Y:2019 01 2019 PAY BILLS ON TIME TO AVOID LATE FEES $1,917 $0 Implemented
AS0477 # 01 Y:2019 01 2019 ADOPT IN-HOUSE MATERIAL GENERATION $718,945 $688,982 Not Implemented
TT0225 # 01 Y:2019 01 2019 APPLY FOR INVESTMENT INCENTIVES $61,196 $11,500 Implemented