IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

218

matching recommendations
Reset
ARC 2.1 Combustion Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0832 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,105 $0 Implemented
OR0512 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $32,700 $20,600 Not Implemented
OR0511 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $35,500 $8,000 Implemented
IC0124 # 06 Y:2006 06 2006 REPLACE BOILER $4,755 $27,175 Not Implemented
GT0830 # 02 Y:2006 02 2006 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $140,680 $87,010 Implemented
GT0830 # 03 Y:2006 03 2006 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $8,256 $36,000 Not Implemented
UF0392 # 01 Y:2006 01 2006 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $32,112 $2,775 Implemented
IC0122 # 02 Y:2006 02 2006 REPLACE BOILER $10,973 $46,865 Not Implemented
NC0350 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,381 $2,000 Not Implemented
AS0431 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $401 $1,500 n/a
AS0431 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,413 $1,500 n/a
IC0123 # 02 Y:2006 02 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $76,409 $252,000 Implemented
TA0127 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $625 $100 Implemented
IA0401 # 10 Y:2006 10 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,235 $18 Not Implemented
OR0508 # 04 Y:2006 04 2006 BURN A LESS EXPENSIVE GRADE OF FUEL $375,000 $480,000 Not Implemented
OR0508 # 02 Y:2006 02 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $53,000 $2,000 Implemented
SU0244 # 13 Y:2006 13 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $1,187,734 $4,100,000 Not Implemented
UU0112 # 04 Y:2006 04 2006 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $69,680 $200,000 Not Implemented
IA0399 # 09 Y:2006 09 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $45,645 $2,000 Not Implemented
IA0399 # 08 Y:2006 08 2006 DIRECT WARMEST AIR TO COMBUSTION INTAKE $5,439 $600 Not Implemented
IA0399 # 01 Y:2006 01 2006 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $608,664 $200,000 Not Implemented
NC0349 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $18,045 $2,000 Not Implemented
IC0121 # 04 Y:2006 04 2006 INSTALL TURBULATORS $7,715 $23,253 Not Implemented
CO0593 # 02 Y:2006 02 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $6,180 $60 Implemented
AM0518 # 01 Y:2006 01 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $44,220 $1,000 Implemented