Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
136
matching recommendationsARC | 2.1 | Combustion Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0203 # 02 Y:2024 | 02 | 2024 | INSTALL AUTOMATIC STACK DAMPER | $55,966 | $1,300 | n/a |
UL2417 # 04 Y:2024 | 04 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $2,595 | $5,797 | n/a |
IP0202 # 10 Y:2024 | 10 | 2024 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $752 | $700 | n/a |
AS0592 # 02 Y:2024 | 02 | 2024 | REPLACE BOILER | $56,229 | $300,000 | n/a |
MI0452 # 09 Y:2024 | 09 | 2024 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $204 | $590 | n/a |
AS0594 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $534,062 | $3,480,000 | n/a |
MS0437 # 04 Y:2024 | 04 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $288,884 | $300,000 | n/a |
UF0623 # 06 Y:2024 | 06 | 2024 | INSTALL TURBULATORS | $979 | $3,750 | n/a |
UF0623 # 07 Y:2024 | 07 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $958 | $1,400 | n/a |
WV0674 # 04 Y:2024 | 04 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $696 | $1,133 | n/a |
WV0670 # 11 Y:2024 | 11 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $237 | $1,029 | n/a |
NT0034 # 05 Y:2024 | 05 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,461 | $1,258 | n/a |
UU0258 # 01 Y:2024 | 01 | 2024 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $158,000 | $725,000 | n/a |
UU0258 # 03 Y:2024 | 03 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,600 | $54,500 | n/a |
SJ0026 # 09 Y:2024 | 09 | 2024 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,261 | $1,017 | n/a |
WV0671 # 14 Y:2024 | 14 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $314 | $1,322 | n/a |
TT0317 # 10 Y:2024 | 10 | 2024 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $56,902 | $80,000 | n/a |
SD0661 # 12 Y:2024 | 12 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $12,725 | $11,775 | n/a |
MU0058 # 01 Y:2024 | 01 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $135 | $370 | n/a |
WV0669 # 11 Y:2024 | 11 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,467 | $940 | n/a |
MS0436 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $13,430 | $50,000 | n/a |
UC2413 # 06 Y:2024 | 06 | 2024 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,482 | $16,784 | n/a |
TT0319 # 02 Y:2024 | 02 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $21,264 | $88,000 | n/a |
AS0588 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $4,538 | $35,163 | n/a |
MS0435 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $10,911 | $100,000 | n/a |