IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,770

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0146 # 08 Y:1998 08 1998 COVER OPEN TANKS $4,417 $699 Implemented
NC0142 # 07 Y:1998 07 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,435 $10 Implemented
AR0141 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $613 $102 Implemented
SD0206 # 03 Y:1998 03 1998 USE OPTIMUM THICKNESS INSULATION $2,817 $1,076 Implemented
KU0496 # 13 Y:1998 13 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $240 $390 Implemented
NV0105 # 02 Y:1998 02 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,271 $21,600 Implemented
NV0105 # 03 Y:1998 03 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,061 $0 Implemented
OD0112 # 02 Y:1998 02 1998 REPAIR OR REPLACE STEAM TRAPS $4,912 $990 Implemented
MS0113 # 03 Y:1998 03 1998 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,852 $7,236 Implemented
MO0232 # 06 Y:1998 06 1998 RECOVER WASTE HEAT FROM EQUIPMENT $5,253 $1,136 Implemented
ME0246 # 02 Y:1998 02 1998 USE OPTIMUM TEMPERATURE $7,462 $0 Implemented
ME0246 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $5,134 $10,930 Implemented
TN0638 # 05 Y:1998 05 1998 INCREASE AMOUNT OF CONDENSATE RETURNED $7,220 $6,550 Implemented
TN0638 # 07 Y:1998 07 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $120 $390 Implemented
UD0552 # 07 Y:1998 07 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,486 $2,000 Implemented
BD0118 # 01 Y:1998 01 1998 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $32,188 $123,000 Implemented
UF0205 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $3,075 $471 Implemented
NC0140 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $4,227 $1,090 Implemented
ME0245 # 10 Y:1998 10 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $443 $174 Implemented
ME0248 # 04 Y:1998 04 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,127 $6,773 Implemented
ME0248 # 09 Y:1998 09 1998 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $550 $1,900 Implemented
ME0249 # 05 Y:1998 05 1998 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $357 $240 Implemented
ME0250 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $5,216 $0 Implemented
ME0250 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $2,390 $0 Implemented
ME0250 # 08 Y:1998 08 1998 RECOVER WASTE HEAT FROM EQUIPMENT $927 $400 Implemented