IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,125

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0446 # 02 Y:1999 02 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,500 $9,500 Not Implemented
OR0354 # 05 Y:1999 05 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $950 $0 Not Implemented
WV0178 # 01 Y:1999 01 1999 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $23,912 $0 Not Implemented
OR0351 # 03 Y:1999 03 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,590 $0 Implemented
OR0351 # 02 Y:1999 02 1999 AVOID FROST FORMATION ON EVAPORATORS $31,270 $48,000 Not Implemented
UM0147 # 02 Y:1999 02 1999 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,796 $2,000 Not Implemented
WV0176 # 05 Y:1999 05 1999 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $11,181 $78,716 Not Implemented
GT0669 # 07 Y:1999 07 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,844 $32,000 Implemented
SD0235 # 06 Y:1999 06 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,794 $14,000 Not Implemented
ND0327 # 01 Y:1999 01 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $17,546 $25,000 Implemented
ND0324 # 03 Y:1999 03 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,258 $30,000 Implemented
SD0234 # 03 Y:1999 03 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,768 $13,000 Not Implemented
GT0667 # 04 Y:1999 04 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $62 $200 Not Implemented
SD0231 # 02 Y:1999 02 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,622 $3,600 Not Implemented
OD0139 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $82 $20 Not Implemented
SF0169 # 11 Y:1999 11 1999 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $55,556 $17,250 Implemented
CO0439 # 01 Y:1999 01 1999 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $187,200 $13,080 Implemented
GT0663 # 09 Y:1999 09 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,805 $4,600 Not Implemented
MA0438 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,055 $3,400 Not Implemented
MA0437 # 04 Y:1999 04 1999 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $2,225 $300 Implemented
SD0222 # 05 Y:1999 05 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $7,799 $11,000 Not Implemented
MA0436 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $7,745 $12,435 Implemented
ME0266 # 01 Y:1999 01 1999 UTILIZE A LESS EXPENSIVE COOLING METHOD $26,281 $10,500 Implemented
ME0266 # 05 Y:1999 05 1999 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,914 $6,370 Not Implemented
UM0137 # 01 Y:1999 01 1999 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $420 $0 Implemented