IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0837 # 01 Y:2012 01 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $65,995 $22,579 Not Implemented
MAS034 # 01 Y:2012 01 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $19,479 $19,600 Not Implemented
MZ0105 # 06 Y:2012 06 2012 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $42,514 $318,000 Not Implemented
MZ0105 # 02 Y:2012 02 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $42,257 $4,645 Implemented
OR0600 # 01 Y:2012 01 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $14,559 $2,500 Not Implemented
OR0599 # 04 Y:2012 04 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,409 $0 Implemented
MI0231 # 11 Y:2012 11 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,120 $1,498 Not Implemented
MAS032 # 01 Y:2012 01 2012 MODERATE COOLING TOWER OUTLET TEMPERATURE $8,920 $8,000 Not Implemented
AM0623 # 01 Y:2012 01 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $75,600 $270,000 Not Implemented
WV0459 # 11 Y:2012 11 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,330 $90 Implemented
SF0422 # 03 Y:2012 03 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $36,414 $12,500 Not Implemented
MZ0098 # 04 Y:2012 04 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,018 $250 Implemented
UD0867 # 09 Y:2012 09 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $23,710 $0 Not Implemented
UD0867 # 10 Y:2012 10 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,097 $0 Implemented
OK0832 # 07 Y:2012 07 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $6,074 $29,738 Not Implemented
NC0464 # 04 Y:2012 04 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $42,271 $58,000 Not Implemented
UD0866 # 16 Y:2012 16 2012 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $7,283 $15,600 Not Implemented
LE0343 # 02 Y:2012 02 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $167,678 $90,000 Not Implemented
LE0343 # 01 Y:2012 01 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $50,414 $67,000 Not Implemented
MAS029 # 03 Y:2012 03 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $8,202 $22,100 Not Implemented
MAS029 # 01 Y:2012 01 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,149 $500 Implemented
MAS029 # 06 Y:2012 06 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,176 $3,920 Not Implemented
MAS029 # 02 Y:2012 02 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,915 $22,500 Not Implemented
TT0096 # 05 Y:2012 05 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,900 $2,000 Not Implemented
UD0865 # 12 Y:2012 12 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $20,832 $25,000 Not Implemented