Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,845

matching recommendations
Reset
ARC 2.3 Electrical Power
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0005 # 10 Y:2022 10 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $323 $0 Not Implemented
UU0214 # 07 Y:2023 07 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $24,046 $226,100 Not Implemented
SU0528 # 05 Y:2022 05 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,343 $660 Not Implemented
AM0871 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $6,228 $23,380 Not Implemented
UU0214 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $14,031 $23,302 Implemented
OR0765 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $5,844 $24,853 Not Implemented
IP0166 # 11 Y:2022 11 2022 OPTIMIZE PLANT POWER FACTOR $11,046 $43,200 Implemented
IP0165 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,564 $11,200 Not Implemented
GT0962 # 01 Y:2023 01 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,691 $200 Not Implemented
UC2206 # 07 Y:2022 07 2022 USE BATTERY STORAGE FOR DEMAND CONTROL $27,967 $231,837 Not Implemented
UC2206 # 01 Y:2022 01 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $31,115 $0 Not Implemented
TT0286 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $12,412 $17,500 Implemented
KS2209 # 08 Y:2022 08 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $79,738 $627,000 Not Implemented
TR0032 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $6,520 $17,100 Not Implemented
UU0212 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $4,400 $9,000 Not Implemented
UU0213 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $1,190 $3,000 Not Implemented
OK1079 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $824 $3,200 Implemented
AM0867 # 05 Y:2023 05 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $34,000 $10,000 Not Implemented
UU0212 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $15,149 $8,500 Not Implemented
UU0213 # 01 Y:2023 01 2023 USE POWER DURING OFF-PEAK PERIODS $7,487 $8,000 Not Implemented
AM0867 # 06 Y:2023 06 2023 OPTIMIZE PLANT POWER FACTOR $23,500 $87,830 Not Implemented
UC2205 # 06 Y:2022 06 2022 USE BATTERY STORAGE FOR DEMAND CONTROL $65,817 $383,577 Not Implemented
UF0587 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,312 $11,024 Not Implemented
UC2205 # 02 Y:2022 02 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $19,018 $0 Not Implemented
UF0587 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $133,034 $448,875 Not Implemented