IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,649

matching recommendations
Reset
ARC 4 DIRECT PRODUCTIVITY ENHANCEMENTS
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0513 # 09 Y:1997 09 1997 MOVE PRODUCT USING MECHANICAL MEANS $46,860 $72,000 Implemented
TN0597 # 01 Y:1997 01 1997 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $420,000 $0 Implemented
UD0508 # 08 Y:1996 08 1996 INSTALL AN UNINTERUPTABLE POWER SUPPLY $135,600 $222,868 Implemented
CO0379 # 01 Y:1996 01 1996 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,440 $48,250 Implemented
ND0259 # 11 Y:1996 11 1996 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $53,610 $15,230 Implemented
CO0379 # 02 Y:1996 02 1996 INSTALL CONTINUOUS LUBRICATION EQUIPMENT $32,640 $3,000 Implemented
ND0266 # 09 Y:1996 09 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $53,783 $23,845 Implemented
ME0205 # 01 Y:1996 01 1996 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $115,428 $0 Implemented
CO0379 # 03 Y:1996 03 1996 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $29,180 $270 Implemented
CO0378 # 02 Y:1996 02 1996 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,590 $630 Implemented
UF0163 # 08 Y:1996 08 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $8,475 $8,488 Implemented
ME0204 # 01 Y:1996 01 1996 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $80,000 $212,393 Implemented
HO0137 # 05 Y:1996 05 1996 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $50,000 $25,000 Implemented
MO0191 # 01 Y:1996 01 1996 INSTALL AUTOMATIC PACKING EQUIPMENT $47,917 $136,000 Implemented
MO0190 # 08 Y:1996 08 1996 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $58,733 $15,000 Implemented
ME0202 # 04 Y:1996 04 1996 ELIMINATE SHIFT $1,125 $0 Implemented
DS0069 # 04 Y:1996 04 1996 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $6,240 $100 Implemented
KG0069 # 15 Y:1996 15 1996 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $177,789 $30,000 Implemented
UF0161 # 07 Y:1996 07 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $11,375 $7,000 Implemented
MA0369 # 01 Y:1996 01 1996 ADOPT IN-HOUSE MATERIAL GENERATION $21,886 $11,000 Implemented
NV0064 # 06 Y:1996 06 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $48,000 $189,800 Implemented
UD0500 # 10 Y:1996 10 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $29,297 $0 Implemented
ME0198 # 05 Y:1996 05 1996 INSTALL SYSTEM TO COLLECT SCRAP $1,800 $1,800 Implemented
IA0153 # 07 Y:1996 07 1996 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $2,570 $250 Implemented
NV0061 # 04 Y:1996 04 1996 INSTALL REFRIGERATION SYSTEM TO COOL PRODUCT $230,000 $40,000 Implemented