IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
ARC 2.262 Chillers and Refrigeration
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0285 # 04 Y:1996 04 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,042 $3,100 Not Implemented
OR0285 # 04 Y:1996 04 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,815 $0 Not Implemented
WI0279 # 08 Y:1996 08 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,917 $9,000 Not Implemented
OR0281 # 07 Y:1996 07 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $10,430 $50,000 Implemented
AS0194 # 01 Y:1996 01 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,241 $8,900 Not Implemented
AS0193 # 01 Y:1996 01 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $34,527 $45,000 Implemented
UF0162 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,640 $3,500 Not Implemented
KG0069 # 02 Y:1996 02 1996 AVOID FROST FORMATION ON EVAPORATORS $6,712 $2,000 Not Implemented
OR0280 # 02 Y:1996 02 1996 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,940 $2,500 Not Implemented
NC0102 # 03 Y:1996 03 1996 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $8,399 $2,500 Not Implemented
OR0279 # 01 Y:1996 01 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,604 $0 Implemented
AS0190 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $190,648 $100,000 Implemented
AS0189 # 06 Y:1996 06 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $2,455 $3,500 Not Implemented
AS0188 # 03 Y:1996 03 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,208 $7,500 Not Implemented
AS0187 # 01 Y:1996 01 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $81,742 $70,000 Not Implemented
IA0153 # 08 Y:1996 08 1996 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,124 $4,500 Not Implemented
OR0271 # 01 Y:1996 01 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,100 $0 Not Implemented
GT0594 # 05 Y:1996 05 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $112,836 $405,000 Implemented
OR0268 # 02 Y:1996 02 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,405 $8,000 Not Implemented
OK0504 # 04 Y:1996 04 1996 USE COLD WASTE WATER TO COOL CHILLER FEED WATER $1,670 $6,000 Not Implemented
AS0184 # 04 Y:1996 04 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $21,398 $25,000 Implemented
AS0184 # 05 Y:1996 05 1996 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $15,892 $35,000 Implemented
WI0275 # 02 Y:1996 02 1996 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,633 $14,000 Not Implemented
NC0098 # 07 Y:1996 07 1996 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,909 $50 Not Implemented
MA0366 # 08 Y:1996 08 1996 UTILIZE A LESS EXPENSIVE COOLING METHOD $435 $250 Not Implemented