IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
Reset
ARC 2.3 Electrical Power
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0418 # 01 Y:2012 01 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $795,000 $1,715,000 Not Implemented
IP0006 # 07 Y:2012 07 2012 USE DEMAND CONTROLLER OR LOAD SHEDDER $36,010 $171,310 Not Implemented
UMS013 # 03 Y:2012 03 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $673,000 $1,000,000 Not Implemented
MZ0104 # 08 Y:2012 08 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $152,137 $150,000 Not Implemented
SU0328 # 02 Y:2012 02 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,399 $1,890 Not Implemented
UMS012 # 02 Y:2012 02 2012 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $553,000 $750,000 Not Implemented
MI0233 # 05 Y:2012 05 2012 OPTIMIZE PLANT POWER FACTOR $10,216 $11,120 Not Implemented
AM0625 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $440 $0 Not Implemented
MA0703 # 01 Y:2012 01 2012 OPTIMIZE PLANT POWER FACTOR $10,588 $9,425 Implemented
MI0232 # 03 Y:2012 03 2012 OPTIMIZE PLANT POWER FACTOR $12,172 $9,640 Implemented
DL0097 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,670 $100 Not Implemented
UM0415 # 03 Y:2012 03 2012 OPTIMIZE PLANT POWER FACTOR $12,081 $20,000 Not Implemented
OK0836 # 07 Y:2012 07 2012 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $248,000 $675,000 Not Implemented
MI0231 # 07 Y:2012 07 2012 OPTIMIZE PLANT POWER FACTOR $4,040 $4,550 Not Implemented
UD0868 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,535 $0 Implemented
BS0010 # 05 Y:2012 05 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $70 $60 Not Implemented
AM0623 # 06 Y:2012 06 2012 OPTIMIZE PLANT POWER FACTOR $4,500 $8,160 Not Implemented
IA0489 # 07 Y:2012 07 2012 OPTIMIZE PLANT POWER FACTOR $8,468 $3,237 Not Implemented
SF0423 # 11 Y:2012 11 2012 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $104,307 $469,980 Not Implemented
UK1214 # 03 Y:2012 03 2012 OPTIMIZE PLANT POWER FACTOR $6,631 $11,880 Not Implemented
UA0088 # 09 Y:2012 09 2012 OPTIMIZE PLANT POWER FACTOR $13,879 $21,400 Not Implemented
UM0414 # 03 Y:2012 03 2012 OPTIMIZE PLANT POWER FACTOR $6,520 $10,000 Not Implemented
AM0622 # 08 Y:2012 08 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,300 $0 Not Implemented
WM0006 # 04 Y:2012 04 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $22,037 $0 Implemented
WM0006 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $341 $0 Not Implemented