IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
ARC 4. DIRECT PRODUCTIVITY ENHANCEMENTS
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0097 # 09 Y:1996 09 1996 EXPAND OPERATIONS INTO UNUSED SPACE $13,475 $0 Not Implemented
NC0097 # 08 Y:1996 08 1996 INSTALL SYSTEM TO COLLECT SCRAP $20,250 $1,000 Not Implemented
UD0508 # 08 Y:1996 08 1996 INSTALL AN UNINTERUPTABLE POWER SUPPLY $135,600 $222,868 Implemented
ND0259 # 11 Y:1996 11 1996 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $53,610 $15,230 Implemented
ME0205 # 01 Y:1996 01 1996 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $115,428 $0 Implemented
CO0379 # 01 Y:1996 01 1996 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $37,440 $48,250 Implemented
CO0379 # 02 Y:1996 02 1996 INSTALL CONTINUOUS LUBRICATION EQUIPMENT $32,640 $3,000 Implemented
CO0379 # 03 Y:1996 03 1996 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $29,180 $270 Implemented
ND0266 # 09 Y:1996 09 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $53,783 $23,845 Implemented
NV0072 # 09 Y:1996 09 1996 ADOPT IN-HOUSE MATERIAL GENERATION $46,800 $600 Not Implemented
CO0378 # 02 Y:1996 02 1996 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $4,590 $630 Implemented
CO0377 # 01 Y:1996 01 1996 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $517,560 $5,000 Not Implemented
UL0170 # 06 Y:1996 06 1996 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $960 $0 Not Implemented
UM0072 # 06 Y:1996 06 1996 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $2,500 $80 Not Implemented
UF0163 # 08 Y:1996 08 1996 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $8,475 $8,488 Implemented
UF0163 # 07 Y:1996 07 1996 INSTALL EQUIPMENT TO MOVE PRODUCT $10,057 $6,250 Not Implemented
NV0069 # 08 Y:1996 08 1996 ADOPT IN-HOUSE MATERIAL GENERATION $31,200 $2,000 Not Implemented
ME0204 # 01 Y:1996 01 1996 INSTALL AUTOMATIC BOILER FUEL FEED SYSTEM $80,000 $212,393 Implemented
AS0195 # 11 Y:1996 11 1996 EXPAND OPERATIONS INTO UNUSED SPACE $67,684 $10,000 Not Implemented
HO0137 # 05 Y:1996 05 1996 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $50,000 $25,000 Implemented
UL0169 # 05 Y:1996 05 1996 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $3,802 $500 Not Implemented
MO0191 # 01 Y:1996 01 1996 INSTALL AUTOMATIC PACKING EQUIPMENT $47,917 $136,000 Implemented
MO0190 # 08 Y:1996 08 1996 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $58,733 $15,000 Implemented
ME0202 # 04 Y:1996 04 1996 ELIMINATE SHIFT $1,125 $0 Implemented
KU0467 # 02 Y:1996 02 1996 PURCHASE EQUIPMENT INSTEAD OF LEASING $8,070 $2,075 Not Implemented