IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0625 # 06 Y:2001 06 2001 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $39,782 $95,000 Implemented
GT0724 # 05 Y:2001 05 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,956 $7,500 Implemented
WV0228 # 01 Y:2001 01 2001 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $221 $130 Not Implemented
WV0227 # 05 Y:2001 05 2001 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $603 $390 Implemented
WV0227 # 04 Y:2001 04 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $704 $50 Not Implemented
WV0227 # 02 Y:2001 02 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,589 $1,980 Not Implemented
WV0224 # 04 Y:2001 04 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,489 $2,436 Implemented
UF0281 # 09 Y:2001 09 2001 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $19,370 $90,464 Implemented
SF0221 # 04 Y:2001 04 2001 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,217 $495 Not Implemented
WV0220 # 06 Y:2001 06 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,872 $1,457 Not Implemented
WV0220 # 05 Y:2001 05 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $241 $36 Implemented
WV0219 # 03 Y:2001 03 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $659 $1,140 Implemented
WV0218 # 04 Y:2001 04 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $121 $60 Implemented
WV0218 # 03 Y:2001 03 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,519 $1,362 Implemented
WI0402 # 02 Y:2001 02 2001 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,517 $55,500 Not Implemented
WV0216 # 06 Y:2001 06 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $99 $80 Implemented
WV0215 # 06 Y:2001 06 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $107 $203 Not Implemented
UD0624 # 01 Y:2001 01 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $29,813 $10,710 Not Implemented
SF0219 # 03 Y:2001 03 2001 MODERATE COOLING TOWER OUTLET TEMPERATURE $415 $406 Implemented
WI0398 # 02 Y:2001 02 2001 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $120,634 $360,000 Not Implemented
LE0111 # 04 Y:2001 04 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $7,807 $0 Not Implemented
SF0218 # 03 Y:2001 03 2001 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,846 $495 Not Implemented
NC0212 # 02 Y:2001 02 2001 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $5,740 $5,000 Not Implemented
NC0212 # 03 Y:2001 03 2001 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,554 $11,000 Not Implemented
MA0486 # 06 Y:2001 06 2001 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,400 $8,000 Not Implemented