IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0144 # 04 Y:2002 04 2002 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $968 $0 Not Implemented
BD0219 # 10 Y:2002 10 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,058 $10,000 Not Implemented
IA0306 # 06 Y:2002 06 2002 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $14,825 $28,000 Not Implemented
CO0515 # 03 Y:2002 03 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $50,000 $26,000 Implemented
IA0304 # 11 Y:2002 11 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,904 $4,000 Not Implemented
OR0422 # 02 Y:2002 02 2002 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $4,106 $2,000 Implemented
OR0422 # 01 Y:2002 01 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,067 $0 Implemented
OR0416 # 02 Y:2002 02 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $19,366 $0 Not Implemented
OR0416 # 03 Y:2002 03 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $13,308 $0 Not Implemented
OR0415 # 03 Y:2002 03 2002 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $1,324 $2,600 Not Implemented
WV0251 # 04 Y:2002 04 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,860 $948 Implemented
GT0739 # 01 Y:2002 01 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $19,440 $122,500 Not Implemented
WV0248 # 09 Y:2002 09 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,002 $0 Not Implemented
WV0247 # 05 Y:2002 05 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,412 $2,100 Implemented
WV0242 # 03 Y:2002 03 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $7,620 $4,870 Implemented
SD0300 # 07 Y:2002 07 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,000 $0 Not Implemented
AS0329 # 03 Y:2002 03 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,444 $43,930 Not Implemented
NC0236 # 01 Y:2002 01 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,684 $6,000 Not Implemented
GT0733 # 03 Y:2002 03 2002 USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION $56,762 $237,300 Not Implemented
WV0240 # 04 Y:2002 04 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $123 $86 Implemented
OR0411 # 01 Y:2002 01 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $20,500 $66,000 Not Implemented
WV0239 # 07 Y:2002 07 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,408 $1,044 Implemented
OR0410 # 01 Y:2002 01 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $17,362 $0 Not Implemented
WV0238 # 09 Y:2002 09 2002 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $6,165 $0 Not Implemented
WV0238 # 02 Y:2002 02 2002 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $424 $60 Implemented