IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
Reset
ARC 2.2 Thermal Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0250 # 04 Y:2021 04 2021 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $19,724 $5,000 Implemented
SF0580 # 01 Y:2021 01 2021 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $18,446 $0 Implemented
UA0249 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $5,261 $8,080 Implemented
MI0399 # 02 Y:2021 02 2021 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $54,060 $240,000 Implemented
WV0616 # 03 Y:2021 03 2021 INSULATE BARE EQUIPMENT $2,901 $1,650 Implemented
MZ0319 # 08 Y:2021 08 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,401 $25,720 Implemented
IP0150 # 05 Y:2021 05 2021 RECOVER WASTE HEAT FROM EQUIPMENT $654 $1,559 Implemented
TT0262 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $4,646 $3,879 Implemented
DL0197 # 05 Y:2021 05 2021 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,034 $1,300 Implemented
IC0250 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $688 $762 Implemented
WV0613 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $10,812 $30,758 Implemented
OK1057 # 02 Y:2021 02 2021 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $12,483 $56,000 Implemented
DL0196 # 06 Y:2021 06 2021 INSULATE BARE EQUIPMENT $1,842 $2,864 Implemented
TT0260 # 07 Y:2021 07 2021 INSULATE BARE EQUIPMENT $783 $700 Implemented
UF0569 # 07 Y:2021 07 2021 USE OPTIMUM TEMPERATURE $3,887 $0 Implemented
UD1030 # 08 Y:2021 08 2021 INSULATE BARE EQUIPMENT $20,126 $28,000 Implemented
SU0507 # 05 Y:2021 05 2021 INSTALL / REPAIR INSULATION ON STEAM LINES $191 $203 Implemented
SD0612 # 08 Y:2021 08 2021 REPAIR AND ELIMINATE STEAM LEAKS $557 $1,000 Implemented
OR0742 # 01 Y:2021 01 2021 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,010 $0 Implemented
SD0611 # 07 Y:2021 07 2021 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,308 $6,000 Implemented
SF0570 # 03 Y:2021 03 2021 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $149,399 $10,195 Implemented
SF0570 # 01 Y:2021 01 2021 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $24,674 $0 Implemented
WV0610 # 12 Y:2021 12 2021 INSULATE BARE EQUIPMENT $409 $488 Implemented
LS2108 # 01 Y:2021 01 2021 REPAIR AND ELIMINATE STEAM LEAKS $7,669 $2,000 Implemented
MA0825 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $41,012 $52,945 Implemented