Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
ARC 2.26 COOLING
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0480 # 08 Y:2000 08 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $8,620 $2,000 Implemented
MA0480 # 09 Y:2000 09 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $930 $0 Implemented
SF0205 # 01 Y:2000 01 2000 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,248 $0 Implemented
MA0473 # 01 Y:2000 01 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,890 $140,000 Implemented
MA0475 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,950 $0 Implemented
NC0202 # 03 Y:2000 03 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,647 $0 Implemented
OR0381 # 04 Y:2000 04 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,850 $8,600 Implemented
SD0246 # 03 Y:2000 03 2000 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,276 $3,000 Implemented
WV0205 # 04 Y:2000 04 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $7,568 $3,000 Implemented
SF0199 # 02 Y:2000 02 2000 MODERATE COOLING TOWER OUTLET TEMPERATURE $4,250 $850 Implemented
TN0693 # 03 Y:2000 03 2000 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $22,100 $8,120 Implemented
SD0258 # 02 Y:2000 02 2000 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $66,333 $50,000 Implemented
CO0469 # 01 Y:2000 01 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,000 $9,500 Implemented
WV0201 # 11 Y:2000 11 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,887 $40 Implemented
WV0199 # 02 Y:2000 02 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,354 $2,088 Implemented
MA0467 # 02 Y:2000 02 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $6,077 $4,000 Implemented
UD0599 # 03 Y:2000 03 2000 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,987 $20,000 Implemented
MA0460 # 04 Y:2000 04 2000 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $5,388 $13,800 Implemented
TN0676 # 03 Y:2000 03 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $6,275 $18,200 Implemented
MA0458 # 05 Y:2000 05 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $757 $1,000 Implemented
SD0237 # 01 Y:2000 01 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $28,985 $88,000 Implemented
WI0365 # 03 Y:2000 03 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $8,830 $26,500 Implemented
ND0345 # 05 Y:2000 05 2000 UTILIZE A LESS EXPENSIVE COOLING METHOD $913 $0 Implemented
WV0182 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,200 $70 Implemented
HO0222 # 05 Y:2000 05 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $723 $4,000 Implemented