IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
Reset
ARC 3.4 Water Use
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0831 # 04 Y:2006 04 2006 MINIMIZE WATER USAGE $17,245 $1,500 Not Implemented
IC0123 # 05 Y:2006 05 2006 TREAT AND REUSE RINSE WATERS $92,357 $31,583 Not Implemented
OR0510 # 01 Y:2006 01 2006 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $61,000 $40,000 Implemented
NC0349 # 08 Y:2006 08 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,891 $4,000 Not Implemented
GT0827 # 08 Y:2006 08 2006 METER WASTE WATER $81,583 $5,250 Implemented
UU0106 # 05 Y:2006 05 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $23,010 $7,390 Not Implemented
AM0518 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,000 $415 Implemented
LE0246 # 04 Y:2006 04 2006 MINIMIZE WATER USAGE $6,264 $1,800 Not Implemented
OR0507 # 08 Y:2006 08 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $32,400 $23,200 Not Implemented
AM0517 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN WATER LINES AND VALVES $10,440 $85 Implemented
OK0736 # 04 Y:2006 04 2006 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,438 $765 Implemented
NC0342 # 02 Y:2006 02 2006 TREAT AND REUSE RINSE WATERS $6,045 $17,292 Not Implemented
UD0745 # 06 Y:2006 06 2006 METER WASTE WATER $10,810 $0 Not Implemented
OR0500 # 04 Y:2006 04 2006 MINIMIZE WATER USAGE $51,600 $105,000 Not Implemented
SU0238 # 08 Y:2006 08 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,018 $1,094 Not Implemented
AM0515 # 05 Y:2006 05 2006 MINIMIZE WATER USAGE $24,580 $15,000 Not Implemented
LL0256 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN WATER LINES AND VALVES $7,057 $1,330 Implemented
LE0237 # 03 Y:2006 03 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $64,774 $2,000 Implemented
GT0824 # 05 Y:2006 05 2006 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,702 $600 Not Implemented
BD0311 # 09 Y:2006 09 2006 MINIMIZE WATER USAGE $656 $3,220 Not Implemented
GT0822 # 01 Y:2006 01 2006 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $22,995 $640 Implemented
BD0309 # 08 Y:2006 08 2006 RECOVER AND REUSE COOLING WATER $25,524 $60,000 Not Implemented
BD0308 # 08 Y:2006 08 2006 MINIMIZE WATER USAGE $254 $1,150 Implemented
NC0336 # 02 Y:2006 02 2006 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $8,595 $1,300 Not Implemented
BD0304 # 11 Y:2006 11 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $471 $300 Not Implemented